MAJOR WORKS EXECUTED DURING 2019

CLIENT – PGCB

DESCRIPTION OF WORK: Procurement of 132 KV Circuit Breaker for Grid Circle Chittagong, Dhaka-South and Bogura.

CLIENT – PGCB

DESCRIPTION OF WORK: Design, Supply, Installation, Testing and Commissioning of 400/230/33 KV, 400/520 MVA 3-Phase Auto Transformer at Kaliakoir 400/230/132 KV Substation with Associate Supply and Services on Turnkey Basis, Kaliakoir, Gazipur.

CLIENT – PGCB

DESCRIPTION OF WORK: Construction, Supply, Installation, Testing & Commissioning of T-3 New Bay with Carrying of 132/33 KV, 35/50 MVA old Power Transformer Including Over Heading of Existing T-1, 33 KV Underground Cable Connection at Amnura 132/33 KV Grid Substation Under GMD, PGCB, Rajshahi.

CLIENT – PGCB

DESCRIPTION OF WORK: Procurement of 400 KV Surge Arrester (SA) for Different Grid Substations of Power Grid Company of Bangladesh Ltd. PGCB.

CLIENT – PGCB

DESCRIPTION OF WORK: Sub-contracting of Postogola 132/33 KV GIS Substation for CCCE, China.

CLIENT – BPDB

DESCRIPTION OF WORK: Construction of Bangladesh 7.4 MWp Solar Photovoltaic (PV) Grid-Connected Power Generation Plant, Kaptai.

CLIENT – BPDB

DESCRIPTION OF WORK: Procurement of Lot-3: Relay for various Distribution Substation with Relay Configuration Software and Relay Communication Cable.

CLIENT – BPDB

DESCRIPTION OF WORK: Procurement of ST-Unit DCS System HMI (Pc’s & Software) Upgradation, Installation and Power Generation Care for Chandpur 150 MW Combined Cycle Power Station, BPDB, Chandpur, Bangladesh on Turnkey Basis.

CLIENT – CWASA

DESCRIPTION OF WORK: Construction and Completion of Small (LV) Power Works and Electrical Works at Modhunaghat Water Treatment Plant and Patenga Booster Pump Station, Chittagong.

 

MAJOR WORKS EXECUTED DURING 2018

CLIENT – BPDB

DESCRIPTION OF WORK: Procurement of spare for performing HGPI of Shikalbaha 150 MW Peaking Power Plant, Chittagong, Bangladesh.

CLIENT – BPDB

DESCRIPTION OF WORK: Upgradation of ABB P14 HMI System of STG-2 of Unit-2 of Fenchuganj CCPP, Sylhet, Bangladesh.

CLIENT – BPDB

DESCRIPTION OF WORK: Procurement of Spares for Control System and Excitation System for Unit-3 of Karnafuli Hydro Power Station, Kaptai, Bangladesh.

CLIENT – BPDB

DESCRIPTION OF WORK: Upgradation of Human Machine Interface (HMI) with the implementation of Free Governor Mode of Operation in Existing Control System of Gas Turbine of Sylhet 150 MW CCPP, Kumargaon, Sylhet, Bangladesh.

DESCRIPTION OF WORK: Procurement of Spares for DCS System for Barapukuria Coal-Fired Thermal Power Station, Dinajpur, Bangladesh

CLIENT – PGCB

DESCRIPTION OF WORK: Design, Supply, Erection, Testing and Commissioning of 1200 SQMM 132 KV XLPE Underground Cable and Accessories for replacement of Damaged 132 KV Cable Connecting Auto TR-3 with 132 KV Reserve Bus Hasnabad 230 KV Grid Substation Under GMD, Dhaka-South, PGCB.

CLIENT – PGCB

DESCRIPTION OF WORK: Supply of Disconnector Switch (DS) for Different Grid Substations.

CLIENT – PGCB

DESCRIPTION OF WORK: Removing, Dismantling, Construction, Installation, Testing and Commissioning of two (02) Nos 132/33 KV, 50/75 MVA Power Transformer at Patakhali 132/33 KV Grid Substation Under GMD, PGCB, Barisal.

CLIENT – TSEL

DESCRIPTION OF WORK: Installation, Testing and Commissioning support of 33 KV High Voltage Switchboard, Indoor RMU, Inverter Panel, Main LT Panel, Transformer, Scada Panels, Auxiliary LT Panels and All Cable Laying and Termination of 20 MW (AC) Grid Tied Solar Power Plant at Nhila, Teknaf, Cox’s Bazar of Technaf Solartech Energy Ltd.

 

MAJOR WORKS EXECUTED DURING 2017

CLIENT: PGCB

DESCRIPTION OF WORK: Testing & Commissioning of Bibiyana 400/230/33KV Substation

CLIENT: PGCB

DESCRIPTION OF WORK: Installation, testing and commissioning works of T-3 & T-4 Transformer with new bay construction including related supply at Joypurhat 132/33KV Grid Sub-Station under GMD, PGCB, Bogra.

CLIENT: PGCB

DESCRIPTION OF WORK: Construction of T-3 transformer new bay, carrying of25/41 MVA,132/33 KV power transformer & construction, installation, testing & commissioning work ofT-3 bay at Niyamotpur 132/33 KV Grid Sub-Station (Naogaon district) under GMD, PGCB, Rajshahi.

CLIENT: BPDB

DESCRIPTION OF WORK: Procurement of I/O cards, Terminal boards and other related cards for Symphony Harmony Control System of Sylhet 150MW Combined Cycle Power Plant, BPDB, Kumargaon, Sylhet, Bangladesh

CLIENT: BPDB

DESCRIPTION OF WORK: Supply of Spare Parts for 132 kV Substation of Baghabari Power Station, BPDB, Sirajgonj, Bangladesh

 

MAJOR WORKS EXECUTED DURING 2016

 

 CLIENT: PGCB

DESCRIPTION OF WORK: SUB-CONTRACTING OF CIVIL WORKS, ERECTION WITH ASSISTANCE FOR TESTING & COMMISSIONING OF 400/230/132 kV AIS SUBSTATION AT KALIAKOIR FOR HYOSUNG, KOREA.

Time of Execution: October 2014 to December 2016

CLIENT: PGCB

DESCRIPTION OF WORK: DESCRIPTION OF WORK: SUB-CONTRACTING OF CIVIL WORKS, ERECTION WITH ASSISTANCE FOR TESTING & COMMISSIONING OF 400/230 kV AIS SUBSTATION AT BIBYANA FOR HYOSUNG, KOREA.

Time of Execution: September 2015 to December 2016

 

AUTOMATION & NLDC INTERFACE SERVICES

CLIENT: BPDB

DESCRIPTION OF WORK: PROCUREMENT OF CONTROL CARDS OF ABB PROCONTROL P14 DCS FOR UNIT NO-2 OF FENCHUGONJ COMBINED CYCLE POWER PLANT AS PRIME SUPPLIER.

Time of Execution: April 2016 to October 2016

CLIENT: BPDB

DESCRIPTION OF WORK: UPGRADATION OF HUMAN MACHINE INTERFACE (HMI) OF DISTRIBUTED CONTROL SYSTEM (DCS) FOR SHIKALBAHA 60MW POWER STATION AS PRIME SUPPLIER.

Time of Execution: May 2016 to November 2016

CLIENT: SUMMIT & ORION

DESCRIPTION OF WORK: COMPLETE CONFIGURATION OF RTU AND CONNECT WITH THE EXISTING NLDC SYSTEM OF SUMMIT 337 MW POWER PLANT & 102 MW ORION POWER PLANT FOR ABB SINGAPORE

Time of Execution: April, 2014 to December, 2014

CLIENT: PGCB

DESCRIPTION OF WORK: NLDC INTREGATION FOR 3 SUBSTATIONS FOR SIEMENNS INDIA

Time of Execution: January, 2015 to March, 2015

CLIENT: BPDB

DESCRIPTION OF WORK: SUPPLY OF SYNCHRONIZING CARD (FOR DCS) OF STEAM TURBINE-2 OF FENCHUGONG POWER SATION

Year of Supply::December, 2014

CLIENT: APSCL

DESCRIPTION OF WORK: NLDC INTREGATION WORKS OF ASHUGANJ 225 MW COMBINED CYCLE POWER PLANT PROJECT INCLUDING SUPPLY OF COMMUNICATION EQUIPMENT. FOR HYUNDAI, KOREA

Time of Execution: October 2015 to March, 2016

 

MAJOR WORKS EXECUTED DURING 2015

 

CLIENT: BPDB

DESCRIPTION OF WORK: MAIN CONTRACTOR FOR BUS BAR UP-GRADATION WORKS OF SIKALBAHA 132 KV SUBSTATION FOR POWER EVACUATION OF 108 MW HFO FIRED POWER STATION, CHITTAGONG.

Time of Execution: January, 2015 to July, 2015

CLIENT: HARBIN

DESCRIPTION OF WORK: CONSTRUCTION OF 4 STORIED MANUFACTURING BUILDING & 3 STORIED HARBIN BUILDING FOR 250 MW POWER PLANT AT BARAPUKURIA (3RD UNIT) FOR CCCE, CHINA

Time of Execution: April, 2015 to December,2015

CLIENT: SNPL-2

DESCRIPTION OF WORK: CABLE LAYING, TERMINATION, TESTING & COMMISSIONING OF 12/20 KV & 76/132 KV XLPE CABLE FOR SUMMIT NARAYANGONJ POWER LIMITED 2

Time of Execution:July, 2015 to November, 2015

CLIENT: SBPL

DESCRIPTION OF WORK: CABLE LAYING, TERMINATION, TESTING & COMMISSIONING OF 12/20 KV & 76/132 KV XLPE CABLE FOR SUMMIT BARISHAL POWER LIMITED

Time of Execution: September, 2015 to December, 2015

 

 

 

MAJOR WORKS EXECUTED DURING 2011-2014

 

CLIENT: PGCB

DESCRIPTION OF WORK: SUB-CONTRACTING OF CIVIL WORKS, ERECTION WITH ASSISTANCE FOR TESTING AND COMMISSIONING OF 2 NOS. 230 KV BAY EXTENSION AND 2 X 150 MVA TRANSFORMER INSTALLATION AT HATHAZARI AND COMILLA NORTH 230/132 KV SUBSTATIONS FOR HYOSUNG, KOREA.

Time of Execution: April, 2009 to February, 2011

CLIENT: DPDC

DESCRIPTION OF WORK: SUB-CONTRACTING OF CIVIL WORKS, ERECTION WITH ASSISTANCE FOR TESTING AND COMMISSIONING OF 5 NOS. 33 KV GIS SUBSTATIONS (NEW) WITHIN DPDC AREA FOR ENERGYPAC. BANGLADESH.

Time of Execution: April, 2009 to June 2012

CLIENT: PGCB

DESCRIPTION OF WORK: SUB-CONTRACTING OF CIVIL WORKS, ERECTION WITH ASSISTANCE FOR TESTING AND COMMISSIONING OF 1 NO. 132 KV SUBSTATION (AUGMENTATION) AT GOALPARA POWER PLANT FOR ENERGYPAC. BANGLADESH

Time of Execution: October, 2011 to June, 2012

CLIENT: DPDC

DESCRIPTION OF WORK: SUB-CONTRACTING OF CIVIL WORKS,ERECTION WITH ASSISTANCE FOR TESTING AND COMMISSIONING OF 2 NOS. 33 KV GIS SUBSTATIONS (NEW) AT JAPAN GARDEN CITY & MOTIJHEEL DHAKA FOR ENERGYPAC, BANGLADESH

Time of Execution: January, 2012 to March, 2013

CLIENT: SMPCL

DESCRIPTION OF WORK: MAIN CONTRACTOR FOR CIVIL DESIGN AND FOUNDATION WORKS OF 2 NOS. OF 230KV BAY EXTENSIONS AND 2 NOS. OF 230 KV TOWERS AT MEGHNAGHAT FOR CNEEC, CHINA

Time of Execution: July, 2013 to October, 2013

CLIENT: PGCB

DESCRIPTION OF WORK: SUB-CONTRACTING OF CIVIL WORKS, ERECTION WITH ASSISTANCE FOR TESTING & COMMISSIONING OF 2 NOS. NEW132/33 KV, 50/75 MVA TRANSFORMER WITH ASSOCIATED 132 AND 33 KV EQUIPMENT AT COMILLA, 230/132 KV SUBSTATION FOR CCCE, CHINA.

Time of Execution: December, 2012 to March, 2014

CLIENT: PGCB

DESCRIPTION OF WORK: SUB-CONTRACTING OF CIVIL WORKS, ERECTION WITH ASSISTANCE FOR TESTING AND COMMISSIONING OF EXTENSION OF 2 NOS. 230 KV BAY EXTENSIONS WITH OUTDOOR AND INDOOR EQUIPMENT AT AMIN BAZAR 230/132 KV SUBSTATIONS AND 2 NOS. AT MEGHNAGHAT 230 KV SUBSTATIONS FOR ABB LTD. INDIA.

Time of Execution: October, 2012 to April, 2014

CLIENT: PGCB

DESCRIPTION OF WORK: MAIN CONTRACTOR FOR CIVIL WORKS ,TRANSPORTATION, INSTALLATION, TESTING AND COMMISSIONING OF 1 NO. 3X45/60/75 MVA, 230/132 KV TRANSFORMER, BAY EXTENSION AT 230 AND 132 KV OUTDOOR AND INDOOR EQUIPMENT AT BOGRA 230/132 KV SUBSTATION.

Time of Execution: July, 2013 to March, 2014

CLIENT: ORION

DESCRIPTION OF WORK: SUPPLY & INSTALL OF LIGHTING OF ORION 102 MW HFO POWER PANT

Time of Execution: July 2013 to December, 2013

CLIENT: RPCL

DESCRIPTION OF WORK: SUB-CONTRACTING OF EBOP WORKS AT 150 MW KODDA POWER PLANT WITH ASSISTANCE FOR TESTING AND COMMISSIONING FOR CCCE, BANGLADESH.

Time of Execution: March, 2014 to December, 2014

 

MAJOR WORKS EXECUTED DURING 1999-2010

CLIENT: BDPD

DESCRIPTION OF WORK: SUB-CONTRACTING OF CIVIL WORKS, ERECTION WITH ASSISTANCE FOR TESTING AND COMMISSIONING OF 6 NOS. 33 KV SUBSTATIONS (NEW & AUGMENTATION) AT KHULNA FOR HYOSUNG, KOREA.

Time of Execution: August, 1999 to December, 2001

CLIENT: DESA

DESCRIPTION OF WORK: SUB-CONTRACTING OF CIVIL WORKS, ERECTION WITH ASSISTANCE FOR TESTING AND COMMISSIONING OF 1 NO. NEW 132 KV SUBSTATION AT MAGHBAZAR & 2 NOS. AUGMENTATION AT BASUNDHARA AND MANIKNAGAR FOR HYOSUNG, KOREA

Time of Execution: September, 2001 to July, 2003

CLIENT: DESA

DESCRIPTION OF WORK: SUB-CONTRACTING OF CIVIL WORKS, ERECTION WITH ASSISTANCE FOR TESTING AND COMMISSIONING OF 6 NOS. 33 KV SUBSTATIONS (NEW & AUGMENTATION) AT DHAKA FOR IRCON INTERNATIONAL, INDIA.

Time of Execution: March, 2002 to NOvember, 2003

CLIENT: DESA

DESCRIPTION OF WORK: SUB-CONTRACTING OF CIVIL WORKS, ERECTION WITH ASSISTANCE FOR TESTING AND COMMISSIONING OF 2 NOS. 33 KV AND 1 NO. 132 KV SUBSTATIONS (NEW) AT MATUAIL, NARAYANGANJ FOR JPPC, CHINA.

Time of Execution: August, 2004 to August, 2005

CLIENT: BDPD

DESCRIPTION OF WORK: SUB-CONTRACTING OF CIVIL WORKS, ERECTION WITH ASSISTANCE FOR TESTING AND COMMISSIONING OF 5 NOS. 33 KV SUBSTATIONS (NEW & AUGMENTATION) AT RAJSHAHI FOR ENERGYPAC. BANGLADESH.

Time of Execution: September, 2004 to December, 2005

CLIENT: BDPD

DESCRIPTION OF WORK: SUB-CONTRACTING OF CIVIL WORKS, ERECTION WITH ASSISTANCE FOR TESTING AND COMMISSIONING OF 14 NOS. 33 KV SUBSTATIONS (NEW & AUGMENTATION) AT KHULNA FOR ENERGYPA. BANGLADESH.

Time of Execution: February, 2005 to July, 2007

CLIENT: PGCB

DESCRIPTION OF WORK: SUB-CONTRACTING OF ERECTION WITH ASSISTANCE FOR TESTING AND COMMISSIONING OF 1 NO. 132 KV GIS SUBSTATIONS (NEW) AT DHAKA FOR CNEC, CHINA.

Time of Execution: February, 2007 to June, 2007

CLIENT: DPDC

DESCRIPTION OF WORK: SUB-CONTRACTING OF CIVIL WORKS, ERECTION WITH ASSISTANCE FOR TESTING AND COMMISSIONING OF 2 NOS. 132 KV CAPACITOR BANK PROJECT AT RAMPURA AND AMIN BAZAR FOR ABB & EEL JV COMPANY.

Time of Execution: February, 2009 to June, 2010